PRECIOUS METALS

IAMGOLD shares jump on Cote construction decision

The respective boards of joint venture partners IAMGOLD and Sumitomo Metal Mining have given the green light to build the US$1.3 billion Cote gold project in Ontario, Canada, setting in motion construction of a “transformational” addition to the partners’ production profiles.

Overhead view of the Cote project site in Ontario, Canada

Overhead view of the Cote project site in Ontario, Canada

Construction is expected to start by September, ramping up through December. The mine is expected to achieve commercial production during the second half of 2023.

"The Cote gold project is transformational to the future of IAMGOLD. At a gold price of $1,700, Côté's expected NPV is over $2 billion, with a 22.4% IRR," IAMGOLD president and CEO Gordon Stothart said this week.

IAMGOLD's expected go-forward capex obligation, excluding sunk costs, is $875-$925 million for its 70% share of construction costs, assuming the leasing of major mining equipment for about $80 million.

The company expects to finance the project via healthy current cash flows, its circa-$800 million in cash on hand and credit on its virtually undrawn $500 million facility.

"Today's construction decision positions the company well for the future by reducing overall operating costs, increasing total production capacity, increasing the number of operating mines and creating greater balance in our geographic diversity," said Stothart.

The openpit mine is expected to produce on average 367,000ozpa over its 18-year mine life, at an average all-in sustaining cost of $771/oz.

Cote hosts more than 7Moz in proven and probable reserves.

The project is near Gogama, south-west of Timmins. The Cote deposit is an Archean low-grade, high-tonnage gold deposit with copper credits, discovered in 2010. It is described as a synvolcanic intrusion-related and stockwork disseminated gold deposit.

IAMGOLD will be the operator. The project is expected to make extensive use of automation, with more than 20 autonomous haul trucks and up to six autonomous drills at full capacity.

Meanwhile, Stothart said IAMGOLD would continue to de-risk the Boto project in Senegal, in parallel with Cote's construction, starting with "meaningful investment in local infrastructure". The 90%-owned Boto project is expected to add about 130,000ozpa to IAMGOLD's profile over an anticipated 12.8-year mine life.

IAMGOLD has issued revised production guidance for 2020 for its three operating mines following the impacts of COVID-19 earlier this year, forecasting total output of 685,000-740,000oz (from 700,000-760,000oz previously) at all-in sustaining costs of $1,195-$1,245/oz (from $1,100-$1,150 previously).

Shares in IAMGOLD (TSX:IMG) achieved a new 12-month high on Tuesday at C$6.57, which capitalises it at more than $3 billion (US$2.3 billion).

 

A growing series of reports, each focused on a key discussion point for the farming sector, brought to you by the Kondinin team.

A growing series of reports, each focused on a key discussion point for the farming sector, brought to you by the Kondinin team.

editions

Mining Journal Intelligence Project Pipeline Handbook 2024

View our 50 top mining projects, handpicked using a unique, objective selection process from a database of 450+ global assets.

editions

Mining Journal Intelligence Investor Sentiment Report 2024

Survey revealing the plans, priorities, and preferences of 120+ mining investors and their expectations for the sector in 2024.

editions

Mining Journal Intelligence Mining Equities Report 2023

Access an exclusive, inside look on the quarterly mining IPOs and secondary raisings data and mining equities performance tables with an annual Stock Exchange Comparisons supplement.

editions

Mining Journal Intelligence World Risk Report 2023 (feat. MineHutte ratings)

A detailed analysis of mining investment risks across 121 jurisdictions globally, built on 11 ‘hard risk’ metrics and an industrywide survey.